Technology


Chevron Analytical Lab
Xcel Mechanical Systems, Inc. installed a fuel laboratory, test facility for Chevron. A solar-to-steam (S.S.) fuel delivery system was used to the test engines.
CPMCA Member:
Xcel Mechanical Systems, Inc.
Owner:
Chevron
l
Contractor:
C.C. Layne and Sons
Architect:
Jacobs
Project Location:
El Segundo


Genesis Solar Project
PMI constructed two power blocks for the Genesis 240-megawatt plant,
all mechanical and structural steel erections
consisting of approximately 100,000 linear-feet of piping,
setting/alignment of two 220-megawatt turbines, pipe rack/structural
steel, (ASME code stamp work).
CPMCA Member:
Performance Mechanical, Inc.
Owner:
Nextera
Contractor:
PMI
Project Location:
Blythe


Genesis Solar Project
ARB installed all
jigs, erection and alignment of all pylons, assembly, installation and
leveling of all 22,000 Solar Collector Elements. Work included
assembling all HCE triple joints, field installation of loop piping, header
piping and underground utilities.
CPMCA Member:
ARB, Inc. – Industrial Group
Owner:
Genesis Solar, LLC
Contractor:
Blythe Power Constructors
Project Location:
Riverside County


NASA/Jet Propulsion Laboratory Flight Project Center Building 321
Xcel Mechanical Systems, Inc. performed site utilities, HVAC, plumbing, remodel and upgrade of the central plant. This LEED Gold Certified project is a seven-story, 195,000-square-foot building.
CMPCA Member:
Xcel Mechanical Systems, Inc.
Owner:
NASA/JPL
Contractor:
Swinerton Builders
Architect:
LPI
Project Location:
Pasadena