![Brea-Olinda Power II](https://www.cpmca.org/wp-content/uploads/2013/07/Brea-Olinda-Power-II-384x398.jpg)
Brea-Olinda Power II
A new facility, consisted of using landfill gas as the gas supply for the combustion turbines, by capturing methane gas from the decaying trash. It was divided into gas collection/conditioning area and the power block area.
CPMCA Member: Performance Mechanical, Inc.
Engineer: GCC – Venture Engineering; Power Block – Stantec
Owner: Brea Power II, LLC
Contractor: DCO Ca., Inc.
Project Location: Brea