Commercial – Retail


General Mills Project Geyser
The General Mills-Yoplait plant project consisted of steam and
condensate, process hot water and hot water heat recovery piping
spanning the entire facility. The centerpiece was a 40’ x 40’ structural
steel platform housing several plate and frame heat exchangers.
CPMCA Member:
Xcel Mechanical Systems, Inc.
Owner:
General Mills
Contractor:
Faithful & Gould
Project Location:
Carson


General Mills Gibson Skid
Constructing a 15’ x 12’ x 10’ tube steel skid with five individual, 28
degrees Fahrenheit/210 degrees Fahrenheit tempering systems was the
project. The shell and tube heat exchanges, vertical
inline pumps, and associated peripherals were built
in the shop and reassembled onsite.
CPMCA Member:
Xcel Mechanical Systems, Inc.
Owner:
General Mills
Contractor:
Faithful & Gould
Project Location:
Carson


Pacific Design Center – Red Building
All Area Plumbing worked on this project. Receiving the 2012 “Q” Award, the Red Building
added 400,000-square-feet of office space and nearly 1,500 parking
spaces.
CPMCA Member:
All Area Plumbing, Inc.
Owner:
Pacific Red LLC
Contractor:
Jones & Jones
Architect:
Pelli Clarke Pelli Architects
Project Location:
West Hollywood


Maguire Glendale North
All Area Plumbing prefabricated the condensing water, chilled water,
heating hot water, refrigerant relief and condensate systems for the 8-
level, 188,746-square-foot commercial office building.
CPMCA Member:
All Area Plumbing, Inc.
Owner:
Maguire Properties LLC
Contractor:
Hathaway Dinwiddie Construction Co.
Architect:
DMJM Design/AECOM
Project Location:
Glendale