Genesis Solar Project

Back to case studies

PMI constructed two power blocks for the Genesis 240-megawatt plant, all mechanical and structural steel erections consisting of approximately 100,000 linear-feet of piping, setting/alignment of two 220-megawatt turbines, pipe rack/structural steel, (ASME code stamp work).