The Eli and Edythe Broad CIRM Center
Back to case studies
The project included lab, hot & cold water, lab waste, lab vacuum, lab air, waste & vent, and prefabricated 99 pipe assemblies with 40 pipe racks for this research facility.
The project included lab, hot & cold water, lab waste, lab vacuum, lab air, waste & vent, and prefabricated 99 pipe assemblies with 40 pipe racks for this research facility.