General Mills Project Geyser

Back to case studies

The General Mills-Yoplait plant project consisted of steam and condensate, process hot water and hot water heat recovery piping spanning the entire facility. The centerpiece was a 40′ x 40′ structural steel platform housing several plate and frame heat exchangers.

Event Email Sign Up

Sign up to be notified about upcoming events and new events added to the calendar.
This field is for validation purposes and should be left unchanged.