Chevron Depropanizer Unit

Back to case studies

PMI installed foundations, underground piping, a new depropanizer tower, a four-level steel structure, vessels, and pumps. They also installed new 30″ Cooling Water piping, supports, and access platforms, and tie-in to basin at an existing cooling tower.

Event Email Sign Up

Sign up to be notified about upcoming events and new events added to the calendar.
This field is for validation purposes and should be left unchanged.